| | |
|
|
|
|
B:TR complete circuit Viewed: 2080 times.
|
| Helix, second corkscrew and final turnaround before station Viewed: 1019 times.
|
| Second loop, first and second corkscrew Viewed: 1049 times.
|
|
| | |
| | |
|
|
|
|
Approach to first corkscrew and second corkscrew coming at us (will there be a concrete trench at the end of the second corkscrew?) Viewed: 1112 times.
|
| Second loop and corkscrews Viewed: 1930 times.
|
| First and Second loop, turnaround and corkscrew Viewed: 1056 times.
|
|
| | |
| | |
|
|
|
|
Jester goes vertical (looks to be station track). Also, Samba Tower kids ride in the background. Viewed: 1616 times.
|
| Crane in the Jester area Viewed: 951 times.
|
| Crane next to a piece of track from Jester Viewed: 770 times.
|
|
| | |
| | |
|
|
|
|
Worker inspecting B:TR's track joints Viewed: 763 times.
|
| Foundation work for the flat rides Viewed: 790 times.
|
| Ground work Viewed: 576 times.
|
|
| | |
| | |
|
|
|
|
Ground work Viewed: 574 times.
|
| B:TR station Viewed: 698 times.
|
| Concrete boom truck and workers pouring foundations for the flat rides Viewed: 818 times.
|
|
| | |
| | |
|
|
|
|
Overview of completed B:TR track Viewed: 1153 times.
|
| B:TR second loop and corkscrews Viewed: 633 times.
|
| Ground work continues Viewed: 710 times.
|
|
| | |